RIELSRIELS
All productsIntegrated protectionSafety switchesCondition monitoringCleaning & alignmentImpact & maintenance
Products/Impact & maintenance

Impact & maintenance

Impact at the load point and idler changes during service — not "protection", but they decide how long a stop lasts.

What this category solves

01

Impact bars fail within three months, and fail again after replacement

02

One idler change stops the line for two hours and four people

03

Wrong selection for dusty areas halves equipment life

Products in this category

3 models
Impact bed→Belt lifter→Explosion-proof range→
Selection support

Not sure of the parameters? Start with a conversation.

Send belt width, speed, material and mounting position. Our engineers recommend a model, supply mounting and wiring drawings, and support site surveys and system design where needed.

  • 01DrawingsMounting and wiring drawings ship with the unit
  • 02Site surveyOn-site confirmation for complex applications
  • 03System designFull-line protection layout and point schedule